Once everything was dried up the ground was graded in order that it would drain properly in the future!!!!!!!!!!!!!!!!!!!!
3. The concrete was poured and we discussed the color and the poor finish with the guys who poured it and were assured it would be fine when it was dry - It isn't fine.
Looks fine except for a few small details........
a) Nice heater - but wait, we have propane and this one is designed for natural gas.
b) Pump looks good - but NO, it's the wrong one, not enough HP
c) We seem to have a couple of leaks that will need to be fixed.
d)The cell that converts the salt to chlorine looks very 'futuristic'.... Pity it doesn't work properly and will need to be replaced.
e) We will soon find out also that the non return valve from the spa is installed incorrectly and the spa water will drop every time we use the pool cleaning system.
Anyway let's not worry about a few minor details right now - here comes our sparkly and rather expensive water.
At the end of the process, (well, we thought it was the end) we had sod laid inside the fence and a patio put down. For this we hired a different contractor and we would recommend him to anyone (Pity he doesn't install pools). This is the tranquil scene before we were hit with the tail end of Hurricane Ida.
And THIS was the result of it
I refer you back to point #2 - where I said that they graded the land to avoid future drainage issues - WRONG AGAIN
We are now working on putting in drainage ourselves and are waiting for all the problems caused by poor drainage to be put right under the warranty of the work done so far- we shall see..............Hopefully we will get the pool closed before Christmas. If not we'll just throw some floating wreaths and candles in and enjoy the view...
No comments:
Post a Comment